|
Product Details:
Payment & Shipping Terms:
|
Condition: | New | Working Station: | According To Stator Yield Per Day |
---|---|---|---|
Dipping Method: | Varnish Dipping Tank Stay Or Move | Machine Color: | White Or Accordingly To Customer Requirement |
Power Source: | Electricity Or Diesel | After Sales: | Machine Almost No Need Maintenance |
Highlight: | impregnation line,varnish impregnation machine |
Automatic Stator Varnish Dipping Machine Motor Impregnation Insulation WIND-ZCJ
Application:
The continuous immersed machine is fully automated, with cycle baking, high production efficiency, good
ventilation, and a greatly improved work environment in the workshop. Therefore, it is widely used in
insulation treatment of small-sized motor coils such as pump,compressor,unversal motor stator and so on.
This type of automatic drip leaching machine is generally used to manually take and place the workpiece,
undergo preheating, dipping, dripping, gelling, and curing processes, and is completed by a chain drive at
a time. The process flow is as follows:
Clean the frame → put the stator → pre-baking → cooling → impregnation →drain → cure →
unload the stator
1. Clean up the frame
Clean the paint on the frame and other impurities, and apply anti-sticking measures to the frame, such as
brush grease.
2. Load on Stator
There should be no dust or other debris on the stator. It must be removed before dipping. The stator is
placed neatly in the frame according to a certain distance. Generally, the stator should be placed
vertically in the frame. Some lead wires have problems such as hardening after drying and poor
conductivity. Therefore, the lead wires are generally bundled and then lifted up to avoid impregnation
before dipping.
3. Preheat
Generally, the preheating section temperature is set to 110-150° C. After the stator undergoes preheating
for 10-30 minutes, the surface temperature reaches about 90 degrees, and the steam in the core and the
coil can be removed. On the other hand, the insulating paint after preheating can be used. Quickly
penetrates into the coil and iron core. From the profile of the continuous immersing machine, it can be
seen that the preheating section is in fact connected to the upper curing section. Therefore, when a
water-soluble insulating paint is used, although the water-soluble insulating paint may not be pre-baked,
the heater of the preheating section cannot be turned off and the temperature setting should be
consistent with the curing section for easy penetration and efficient use of the curing time.
4. Cooling
After the stator passes out of the preheating section, the temperature is not uniform, and the local
temperature is too high. If the high-temperature workpiece directly enters the oil-soluble insulating paint,
the solvent will evaporate rapidly and cause a safety accident. In addition, when the insulation paint is in a
high temperature state for a long time, the probation period is drastically reduced, and an increase in
viscosity or even an overall gel is liable to occur and the pipe is clogged. Therefore, it is necessary to go
through a brief cooling to reduce the stator temperature to about 70 degrees.
5. Dipping
The sloping frame is completely immersed in the lacquer. The immersion lacquer time is generally
controlled between 30-80 s. It is adjusted according to the size and structure of the stator. The flow rate of
the dipping paint should be adjusted to ensure that the dipping tank is full of paint.
6. Solidification
After the lacquer work is completed, the workpiece enters the drying tunnel with the driving device to
complete the curing process. Depending on the size of the workpiece, it usually takes 1-3 hours.
Parameter:
Name | Unit | 130-16 | 130-26 | 130-46 |
Station | pcs | 16 | 26 | 46 |
Dipping depth | mm | 130 | 130 | 130 |
Basket area | mm | 850×300 | 850×300 | 850×300 |
Loading- bearing | kg | 80 | 80 | 80 |
Pitch time | min | 1~90min adjustable | ||
Heat rise time | min | <45 | ||
Tunnel Tem. | ℃ | ≤160℃ | ||
Dimension | m | 3.8×2.2×2.5 | 6×2.2×2.5 | 10×2.2×2.5 |
Power | kw | 40 | 60 | 80 |
Dipping depth Varnish impregnation: 130mm
Rack loading area: 850*300
Rack loading weight: 80Kg
Pitch time: 1-30min adjustable
Heating time: <45 min
Tunnel working temperature: ≤150℃
Power consumption: 60
Dimension: 6*2.2*2.5
Weight: 5.8 Ton
In situation 2, the varnish tank don't move and don't need transmission, no drive needed,
Stator varnish machine which mainly applied to stator winding insulation treatmen composed of machine
body, water cooler chiller and varnish supply tank.
Please click below picture to view video